ISO 9001:2015ITAR RegisteredRoHS · REACHLead time from 3 business daysMOQ = 1 part
PifyC
Services
Materials
Industries
Applications
Resources
Locations
Company
Request a quote
5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions
Service · Inspection

Verify before scale. Document fully. AS9102 / PPAP.

First Article Inspection (FAI) services for aerospace, medical, automotive industries. Comprehensive dimensional verification, GD&T compliance, material certification, full documentation per AS9102 (aerospace) or PPAP (automotive) format.

Inspection & testingWuxi, ChinaMOQ 1 partDFM review included
Technical plate for Verify before scale. Document fully. AS9102 / PPAP.
How we run it

First article inspection services

Different industries require different FAI formats. We provide documentation in customer-required format with all standard content.

3-7 daysTypical lead time
MOQ 1No minimum quantity
<4 hQuote response
ISO 9001Quality system
01 · FAI standards

FAI documentation formats.

AS9102 (aerospace)

Aerospace First Article Inspection per AS9102 Rev C. Form 1 (part identification), Form 2 (product accountability), Form 3 (characteristic accountability). Standard for aerospace tier-2/3 supply chain.

PPAP (automotive)

Automotive PPAP per AIAG (US) or VDA (European). Levels 1-5 depending on customer. Includes design records, FMEA, control plan, capability studies. Standard for automotive Tier-1 launches.

Custom customer FAI

Some customers (medical, defense) have specific FAI formats. We complete in their template with same underlying inspection rigor.

Dimensional verification

First article: 100% inspection of all drawing features. CMM verification of GD&T, calipers/micrometers for standard features, special test for unique requirements.

Material certification

Material certificates per EN 10204 3.1 — chemistry, mechanical properties, heat number traceability. Sometimes 3.2 (witnessed) for critical applications.

Process records

Documentation of all process steps: heat treatment certificates, coating certificates (anodize, plating), special process records.

Statistical process

For production parts after FAI, statistical process control with Cpk targets. First article shows process capability for ongoing production.

Customer signoff

Customer reviews and signs off FAI before production release. Production halted until approval.

Revisions handled

Drawing revision changes trigger updated FAI. Customer notified of revision FAI before production change.

Different industries require different FAI formats. We provide documentation in customer-required format with all standard content.

02 · FAI process

FAI workflow.

Drawing review

Drawing reviewed for clarity, GD&T interpretation

CMM programming

First-article CMM program developed (1-3 hours typical)

Material certification

Material certificate sourced from supplier

Manufacturing

First article produced per drawing using documented process

Dimensional measurement

100% feature inspection vs drawing tolerance

Process documentation

Heat treat, coating, special process certs collected

Report assembly

FAI report assembled in customer format

Internal review

Internal QA review before customer submittal

Customer submission

Submitted to customer with cover letter

Get an instant quote

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

Talk to an engineer

WhatsApp our team directly. Most messages answered within 12 minutes during work hours.

Explore all services

CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.

FAQ

Verify before scale — questions

What's included in standard AS9102?

AS9102 Rev C content: (1) Form 1 — part identification (number, name, revision, supplier). (2) Form 2 — product accountability (drawing notes, special characteristics, materials). (3) Form 3 — characteristic accountability (every feature with nominal, tolerance, actual). Plus attached: material certifications, special process certs, dimensional inspection records, photos. Typical AS9102 package: 10-40 pages depending on part complexity.

PPAP levels — which to use?

PPAP Level 1: warrant only. Rare for new programs. Level 2: warrant + samples + limited docs. Level 3: most common — warrant + samples + complete documentation package. Level 4: as Level 3 plus customer-specific requirements. Level 5: as Level 4 plus parts and complete supporting data retained at supplier. Customer specifies — typically Level 3 for production launch.

CMM accuracy required?

For typical FAI, CMM repeatability ±0.002 mm adequate. Calibration traceable to NIST. Specific high-precision applications (aerospace, semiconductor) may require ±0.001 mm — partner with calibration labs for ultra-precision measurements. Most production CMM work meets standard accuracy requirements with documented calibration.

How long for FAI?

Simple part FAI (10-20 features): 1-2 days for measurement + 2-3 days documentation. Complex part FAI (50+ features with extensive GD&amp;T): 5-10 days total. Aerospace AS9102 with full documentation: 7-14 days typical. Plan FAI timing into project schedule — production gate typically requires customer FAI approval.

Re-inspection after design change?

Drawing revision triggers re-inspection — features changed by revision require new measurement. Some customers require complete FAI on every revision; others only on significant changes. Specify customer policy upfront. We track revision changes and re-inspect appropriately.

Documentation retention?

AS9102 records retained 10+ years per FAR. Aerospace customers often require 25+ year retention. Medical: full product life + 2 years per FDA. Automotive: 15 years per IATF 16949. Our standard archive policy: 10+ years for all quality-controlled orders, longer per customer requirement.

5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions

Send a CAD file. Get an engineering-reviewed quote.

No minimum quantity, free DFM feedback from a senior manufacturing engineer, and an NDA signed before file review on request.