Side-by-side summary.
Injection Molding
Molten plastic injected into steel or aluminum tooling. High setup cost, low per-part cost. Best for high-volume production (>1,000 pieces), real production materials, excellent finish.
3D Printing (SLS/MJF)
Nylon powder bed fusion. No tooling. Linear cost per part. Best for low volumes (< 500 pieces), design iteration, complex geometry. Production-grade nylon PA12 available.
Feature-by-feature breakdown.
| Attribute | Injection Molding | 3D Printing (MJF/SLS) |
|---|---|---|
| Tooling cost | $3,000 (rapid Al) to $80,000 (production steel) | $0 |
| Tooling lead time | 14 days (aluminum) to 8 weeks (steel) | None (direct print) |
| Per-part cost (qty 10) | $100+ (tool amortization) | $15–40 |
| Per-part cost (qty 100) | $15–30 | $15–40 |
| Per-part cost (qty 1000) | $2–8 | $15–40 |
| Per-part cost (qty 10,000) | $0.50–3 | $15–40 |
| Break-even vs 3DP | 500–5,000 parts typically | - |
| Material options | Any thermoplastic + elastomers | Nylon PA12, PA11, PA12-GF |
| Surface finish | SPI-A2 (mirror) to SPI-C (rough) | Ra 6–10 µm (grainy but uniform) |
| Dimensional accuracy | ±0.1 mm typical | ±0.2 mm typical |
| Internal channels | Very limited (requires complex mold) | Full freedom |
| Design iterations | Mold modification required | Send new STL |
| Material waste | Minimal (sprue recycled) | Unused powder mostly recycled |
| Color options | Pre-colored or painted | Dyed post-print (limited colors) |
When to choose each.
Choose Injection Molding when:
Choose 3D Printing (SLS/MJF) when:
Get an instant quote
Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.
Talk to an engineer
WhatsApp our team directly. Most messages answered within 12 minutes during work hours.
Explore all services
CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.
Working on a live project? Send the STEP file and the two or three features you are unsure about — an engineer replies with DFM notes and a price, usually within four working hours.