Key principles.
Major
CNC: no tooling. Mold: $20-100K tool. Crossover above 1-5K parts.
High vs low
CNC $20-200/part. Molded $0.50-10/part. 5-20× difference.
Fast vs slow
CNC 5-10 days. Mold 8-12 weeks build + parts.
CNC tighter
CNC ±0.025 mm. Mold ±0.1-0.3 mm typical.
CNC any / Mold molded
CNC any geometry. Mold draft + uniform walls + no undercuts.
Bar vs molded grade
CNC bar stock. Mold plastic injection grade. Slightly different properties.
FAQ
1-5K parts depending on complexity. Below: CNC. Above: mold investment pays back.
Aluminum mold tooling for low-volume bridge production. Urethane casting for short-run.
CNC bar/sheet stock. Injection-grade material has different rheology. Specs may differ.
CNC ±0.025 mm achievable. Injection ±0.1 mm typical. Tight features post-machined.
Molding: 1-2° draft, uniform walls, no undercuts (or slides). CNC: any geometry within tool reach.
CNC prototype + injection production. Standard product development path.
Get an instant quote
Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.
Talk to an engineer
WhatsApp our team directly. Most messages answered within 12 minutes during work hours.
Explore all services
CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.
Working on a live project? Send the STEP file and the two or three features you are unsure about — an engineer replies with DFM notes and a price, usually within four working hours.