ISO 9001:2015ITAR RegisteredRoHS · REACHLead time from 3 business daysMOQ = 1 part
PifyC
Services
Materials
Industries
Applications
Resources
Locations
Company
Request a quote
5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions
Custom · Electronics

PCB enclosures. Connector cutouts. EMC ready.

Custom electronic enclosures and housings. Sheet metal or CNC-machined. PCB mounting bosses, connector cutouts, EMC shielding, thermal management integrated.

Enclosures & housingsWuxi, ChinaMOQ 1 partDFM review included
Technical plate for PCB enclosures. Connector cutouts. EMC ready.
How we run it

Custom electronic housings

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

3-7 daysTypical lead time
MOQ 1No minimum quantity
<4 hQuote response
ISO 9001Quality system
01 · Capabilities

Electronic Housings we manufacture.

Custom electronic housings per customer specification — design through delivery.

Get an instant quote

Send your CAD — we reply with detailed pricing, lead time, and DFM feedback within 4 working hours.

Talk to an engineer

WhatsApp our team directly. Most messages answered within 12 minutes during work hours.

Explore all services

CNC, 3D printing, injection molding, sheet metal, casting, finishing — one quality system, one partner.

FAQ

PCB enclosures — questions

Material selection?

Sheet metal cheap. CNC aluminum premium. Plastic injection mass-production. Choose per volume, aesthetics, cost target.

EMC compliance?

Conductive coating (alodine, conductive paint), gasketing for seam closure, ground straps. Customer EMC tests before certification.

IP rating?

IP54, IP65, IP67 typical. O-ring sealing, gasketed seams, IP-rated cable glands. Tested per IEC 60529.

Volume scaling?

Sheet metal economical 100-10,000 units. Diecast 10,000-1,000,000+. Plastic injection 1,000-1,000,000+. CNC for prototype to ~500.

Custom branding?

Laser engraving, painted graphics, custom labels integrated.

Lead time?

Sheet metal 4-6 weeks. CNC 3-4 weeks. Diecast tooling 12-16 weeks. Plastic injection tooling 8-12 weeks.

5-axis CNC milling drawing: Al 7075-T6 block with pockets, toolpath and dimensions

Send a CAD file. Get an engineering-reviewed quote.

No minimum quantity, free DFM feedback from a senior manufacturing engineer, and an NDA signed before file review on request.